We’re proud to share the successful delivery of a full refurbishment of the men’s toilet facilities at MMID Manchester, designed to support the continued growth of the business and increased staffing levels.
Key highlights of the project:
Structural Reconfiguration – We removed a concrete block partition wall after confirming it was non-load bearing, opening up the space to allow for improved functionality.
Increased Capacity – The facilities have been upgraded from 3 cubicles to 6, significantly enhancing usability for the growing team.
Hygienic & Durable Finishes – Installed 10mm hygienic wall cladding and safety vinyl flooring, fully capped and coved for a clean, watertight finish.
New Suspended Ceiling – Featuring integrated LED lighting with built-in emergency lighting, offering improved energy efficiency and compliance.
Improved Ventilation – A new extraction system ensures better airflow and odour control.
Modern Fixtures – Installed compact laminate cubicles, IPS frames, and vanity unit, complete with concealed cisterns and high-quality sanitaryware.
Inclusive Design – Fitted squat pans to accommodate diverse cultural and religious requirements.
A clean, modern, and inclusive space that supports MMID’s operational needs while maintaining a high standard of hygiene and comfort.
If you’re planning a workplace refurbishment or washroom upgrade, feel free to get in touch. Let’s talk about how we can create spaces that support your team and business growth.